    Summary Details

    Estimate: 
    Owner: The City of Marble Falls
    Location: 

    Scope: The Project consists of replacing existing Clarifier No. 1 equipment and two (2) high
    service pumps at the City’s Water Treatment Plant. The Project includes rehabilitating
    existing Clarifier No. 1 interior concrete basin walls and floor, installing galvanized steel
    stairs and perimeter walkway for existing Clarifier No. 1, and installing associated
    electrical components and SCADA control and instrumentation.

    Pre-Bid Details
    Date: 05.12.2020
    Time: 10:00 AM
    Location: City of Marble Falls Water Treatment Plant, 2502 Circle Drive, Marble Falls, TX
    78654

    Bid Details
    Date: 05.21.2020
    Time: 10:00 AM CST

    Documents & Files (3):

     
    Location:
    Click Here for Location Map

  • Project Estimator: Bruce A. Matous , Office Phone 254.780.1400, Mobile Phone 254.534.8010

    Summary Details

    Estimate: $4,000,000 - $6,000,000
    Owner: Travis County WC&ID No. 10
    Location: 717 1/2 Yaupon Valley Dr., West Lake Hills, TX 78746

    Scope: Work of the contract is for the construction of the McConnell Pump Station Improvements for
    Travis County WC&ID No 10. The proposed facility will be constructed on Travis County WCID
    No. 10 Property at 717 ½ Yaupon Valley Dr., West Lake Hills TX 78746. The facility shall have
    a new electrical building. A natural gas emergency generator and transformer shall also be part of
    the proposed site. The site work shall include storm water drainage, paved vehicle access, and
    miscellaneous site improvements.
    The proposed project includes:
    A. Replacement of existing pumps with three (3) new 2600-GPM pumps;
    B. 23’-4” x 38’-4” Electrical Building;
    C. Elevated Transformer Pad and Conduit Bridge;
    D. On-Site Generator;
    E. Existing Pump Building Upgrades;
    F. Drill Shaft Retaining Wall;
    G. Duct Bank Construction;
    H. Drainage;
    I. Fence Installation;
    J. Site Paving and Driveway.

    Pre-Bid Details
    Date: 05.12.2020
    Time: 10:00 AM
    Location: Webex

    Bid Details
    Date: 06.18.2020
    Time: 10:00 AM CST

    Documents & Files (9):

     
    Location:
    Click Here for Location Map

  • Project Estimator: Bruce A. Matous , Office Phone 254.780.1400, Mobile Phone 254.534.8010

    Summary Details

    Estimate: 
    Owner: The City of Waco
    Location: North of Waco

    Scope: The project consists of the furnishing of all labor, materials, equipment, appurtenances
    and incidentals as required to properly design, fabricate, construct, inspect and test the
    following construction items: New 250,000‐gallon GST, 10 Hp duplex packaged booster
    station, two (2) 200 Hp high service pumps, two (2) new chemical injection buildings
    and equipment installations, two (2) control valve vaults, RPZ enclosures, four (4) meter
    vaults, and all piping/valving, plumbing and ventilation, appurtenances, accessories,
    painting, disinfection, testing, and site work as shown on the project Plans and specified
    herein.

    Bid Details
    Date: 06.17.2020
    Time: 2:00 PM CST

    Documents & Files (2):

     
    Location:
    Click Here for Location Map

NOTE: We recommend Google Chrome or Firefox for downloading documents.

These documents are for the purpose of preparing bids for projects. No other use is authorized by Matous Construction. Matous Construction is not the owner or creator of these documents and is not responsible for the completeness or accuracy of them. Bidders must satisfy themselves they have the latest and correct information. Downloading documents & files constitutes proof of agreement to these terms.